home page
Contact   About   News   Downloads   Seminar   Sitemap

Search our site - powered by Google
 
 
Site in Russian
 
 
Home   >   Services  >   Mine Modelling
SERVICES
MODELLING
 
 

Mine Layout & Controlled Mining Integration


Mine Layout Design Audit for Rockmass Stability

Objective:
Audit for rockmass stability of the planned mine layout to quantify seismic potential and the spatial distribution of seismic hazard; thus facilitating layout optimisation

Audit:
Methodology & Procedures developed by ISS International Ltd. - ISO9001 certified

Applications:

  • long term planning (new designs)
  • medium term planning (2-year, 5-year)
  • planned layouts in the vicinity of hazardous geological structures

mine layout

 


Calibrate by Integration

ISSM - Directly incorporates historic seismic data - spatial hazard assessment

Audit Benefits:

  • Improved control of seismic hazard
  • Increased confidence in design decisions
  • Comprehensive design document

Audit Deliverables:

  • Mine-Wide Calibrated Models... for further use by the mine
  • Empirical Relationships... integrated "rockmass"/structures response
  • Quantitive Seismic Hazard Assesment
  • Spatial Assesment of Seismic Hazard... Short term analysis
  • Interpretation & Layout Recommendations


Integration for Controlled Mining

Integration for Controlled Mining:
Methodology & Procedures developed by ISS International Ltd. - ISO9001 certified

Objective:
provide logistical support for controlled mining sites

assist production personnel to make short term
changes to the mining operations (controlled mining)

Stability Assessment Incorporates:

  • Current mine layout
  • Rockmass response
  • Hazardous geological structures response
  • Current seismic data

Applications:
Short term planning (weekly):

  • control mining rate
  • control panel sequence
  • control resource deployment (risk management)

    mine map


Integration:
ISSM - Directly incorporates measured seismic strain and equilibrates modelled stress accordingly

Mine Control Parameters Tested:
- Weekly face advance
- Mine layout

Integration toolbox:

ISSM; Jdi; iv4Di; 4Di; Faultism; VMAP; xmts; Hazard; IDR

Integration for Controlled Mining Deliverables:

Controlled Mining Site Calibrated Model... for further use by the mine
Empirical Relationship... weekly update of the detailed site response

Seismic Hazard Assesment:

  • temporal: integrated with time history analysis
  • spatial: structures and abutments
  • Interpretation & Recommendations


This page last updated: January 2007top of page
 
Home    Products    Services    Applications    Downloads    Annual Seminar    Courses    Contact    About    News    Sitemap
Copyright © 2006-2007 ISS International Ltd.